Customization: | Available |
---|---|
Place Style: | Horizontal |
Range of Applications: | Industrial |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Hydraulic Furnace Changer Switch
Hydraulic furnace changer switch suitable for high voltage (2t-90t) high current equipment, with energy storage system, automatic pressure compensation, to ensure that the bus electrode will never relax.
Features
1. High conductivity of the meshing surface: The contact surface of the bronze medal is processed by mirror milling, and the meshing area reaches 99%.
2. Long pressure holding time: a high pressure hydraulic cylinder is used, and a pressure holding valve and an energy storage tank are added to the hydraulic circuit, which completely solves the problem of pressure relief.
3. High overall strength: The main beam adopts tenon technology and "field-shaped" structure to ensure the overall strength; the hydraulic cylinder adopts a counter-pressure structure, and the bronze medal is not deformed.
4. Customized bronze medal: The copper bar adopts a water-cooled integrated copper bar, which has a good heat dissipation effect and can prevent leakage. The contact surface is silver-plated, the contact resistance is small, and the contact surface does not heat up.
5. Automation: One-key operation, safe, convenient and efficient.
6. PLC control: It can be connected with the operating system of the intermediate frequency electric cabinet to realize automatic control.
Why to Use a Furnace Change Switch?
When the intermediate frequency melting furnace adopts the configuration scheme of one power supply cabinet and two melting furnaces,
Two smelting furnaces need to be connected to the power cabinet separately, and the furnace change switch is used at this time; or when two groups of power cabinets, one large and one small, are connected to a smelting furnace separately, the furnace change switch is also used at this time; The traditional method of changing the furnace switch is to switch the water-cooled cable by disassembling the bronze plate; due to the frequent disassembly and assembly of the bronze plate, the labor intensity of the workers is increased, the safety is poor, and the manual disassembly and assembly, sometimes due to the paralysis of the workers, during assembly, the connection If the bolts are not tightened, when the furnace is opened, a "fire" phenomenon will occur, which will inevitably damage the thyristor and affect production.
Pre-sale service
We are committed to helping you more, not only in the melting and heating system, but in providing you with better solutions throughout a whole production line.
After-sale service
1. On-line commissioning, for the coreless induction melting system produced by our company, we provide on-line commissioning service without geographical restrictions, so that your system can be put into operation as soon as possible.
2. Provide maintenance services for important components such as circuit boards, coils, and yokes. After repairing, they can meet the original technical indicators and factory standards.
3. Original spare parts service is a hasty job. We have a complete spare parts warehouse to ensure that regular spare parts can be shipped within 24 hours. For circuit boards, yokes, reactors and other self-developed products, we can provide you with cost price, saving you the cost of purchasing accessories after sale;
4. Provide overhaul service, we retrofit your system to the latest system, meet the latest electrical and control standards. This means greater reliability, efficiency and productivity without having to invest in new systems.
5. For the coreless induction smelting system produced by our company, we provide capacity-upgrade services, and we can upgrade it on the basis of the original one to improve productivity without investing in a new system.
6.Taining service. We also train your employees and instruct them in the operation of your system.